Building-Wide CCTV Upgrades

Replace the building’s CCTV without ever turning it off.

Staged upgrades of ageing building CCTV for Perth office towers — old system recording until the new one is proven, risers cabled properly, retention set to policy, and a system your team can actually operate.

Staged cutovers, no coverage gap

The old system keeps recording while the new one goes in. Cameras cut over zone by zone — lobby, car park, dock, lift lobbies — and nothing is decommissioned until its replacement is proven and recording.

Riser & backbone cabling

Building-wide CCTV lives or dies on the risers. We run and certify the backbone properly — labelled, documented, fire-stopped at penetrations — reusing existing pathways where they’re sound to keep cost down.

Retention set to policy

Storage sized from a written retention policy — per camera, per zone — rather than whatever the recorder happened to ship with. When an insurer or the police ask for footage from three weeks ago, the answer is yes.

A system management can use

Handover includes trained operators, documented cameras, sensible naming and an export workflow the concierge can follow — not an admin password on a sticky note and a manual nobody opens.

The upgrade problem

Ageing CCTV fails quietly — and the upgrade can’t be allowed to fail loudly.

Building CCTV rarely dies all at once. A camera drops off here, a hard drive there, the recorder’s software stops getting updates, and one day the FM discovers that half the “coverage” on the schematic hasn’t recorded in months. By then the system is too old to patch and too critical to simply switch off for a rebuild.

The answer is a staged replacement run like any other works program in an occupied tower: zones sequenced so the old system covers each area until the new one is proven, riser work after hours with permits and inductions handled, tenants notified before ceilings open, and common areas clean each morning. As the team behind Great White Security — WA Security Licence 79960, $20M public liability, 21+ years in the industry — we hand over a documented system and trained operators, so the upgrade ends with a building that can use what it paid for.

Common questions

Will the building lose CCTV coverage during the upgrade? +

No — that’s the point of staging it. The existing system keeps recording until each zone’s replacement is installed, tested and recording. Where old and new must briefly share a location, we sequence the swap within a single shift, usually after hours, so any window without a camera is minutes in one spot, not days across the building.

Can existing cabling be reused? +

Often, partly. Sound structured cabling and usable pathways can carry the new IP system; older coax can sometimes be reused with converters as an interim step, though a fresh backbone is usually the better long-term answer. We test what is in the risers and quote both honestly — reuse where it is genuinely sound, replacement where it is not.

Which platforms do you install for building-wide systems? +

We work across the major commercial platforms — including AXIS, Hanwha Vision, Bosch, Hikvision, Dahua, Uniview and Vivotek — and recommend based on the building’s scale, budget and what management needs to operate, not a house brand. The recording platform is chosen for the operators who will actually use it.

How is retention decided for a base-building system? +

From the building’s policy, written down — how long each zone’s footage is kept, who can view live versus recorded, and who is authorised to export. We size storage to meet it with headroom, and document it so management can answer an insurer or privacy query with a policy rather than a shrug.

Building CCTV past its useful life? Get a staged upgrade proposal that never drops coverage.

No obligation

Request a Proposal

Tell us about your office and what you're planning. We'll come back with a clear scope and honest pricing.